BessCare
DoGo Power
BiWatt
Choose your market
Menu
Press release — labelled content

BYD launches 62 MWh GC Block for gigawatt-scale battery storage plants

September 17, 2026 · BessCare Newsroom

This article was generated with AI assistance from cited sources and has not been individually reviewed by an editor.

BYD Energy Storage has launched a standardised battery storage unit — the GC Block — with three configurations covering two- to six-hour applications and up to 62 MWh of capacity. The product is aimed at gigawatt-scale storage plants, where standardisation cuts engineering and delivery time.

The GC Block’s modular design targets the utility-scale segment, where project developers are increasingly seeking standardised blocks that can be replicated across multiple sites rather than bespoke systems engineered from scratch. The three configurations let a single platform serve two-hour, four-hour and six-hour duration markets.

The launch continues BYD’s push into large-scale storage, which has included supply agreements for projects such as Greenvolt’s 600 MW / 2.4 GWh Siedlce project in Poland, announced in mid-2026.

For C&I and utility-scale buyers, standardised blocks of this size matter because they compress engineering lead times and reduce integration risk — the two factors that most often delay large storage projects.

Sources

  • Energy Storage News — BYD launches 62 MWh GC Block for gigawatt-scale battery storage plants (16 September 2026): link
← Back